TOWNSHIP PARK UPDATE: Access to the park entrance on Dade will be limited on Tuesday and Wednesday this week as Montgomery installs the force main through this area.
Dean Lake is a naturally occurring lake with shared ownership by waterfront parcels. Flooding during wet weather events has a negative impact on nearby properties. The Kent County Drain Commissioner (KCDC) is building a pump station and force main to convey flows to the Hills & Dales drain to prevent future flooding.
The force main portion of the project will be constructed in the late summer and fall of 2025. The pump station and lake intake structure construction will begin in the fall of 2025 and be completed in the spring of 2026, some winter work is anticipated. The project is scheduled to be complete and operational by June 2026.
Access/Traffic:
Local traffic will be maintained during construction. There may be times when your driveway is inaccessible because force main construction is occurring in front of your house or driveway restoration is taking place. The contractor will work with you ahead of time and will make special access arrangements with you if needed.
Mail:
Mailboxes that interfere with construction will be temporarily relocated so that mail service can be maintained during construction. If your mailbox needs to be temporarily relocated, the contactor will inform you of where it has been moved to and when they anticipate it will be returned to its original location.
Garbage Pickup:
The contractor will work with you and your waste hauler to maintain service throughout construction. If construction interferes with your waste haulers ability to pick up your garbage, the contractor will temporarily move your garbage bins to a central location and return them to the end of your driveway by the end of the work day.
P&N Engineer
Kevin L. Gritters, PE
Jeremy Kamp, PE
(616) 364-8491
P&N Construction Observer:
P&N will have representatives in the field throughout construction.
Contractor
Montgomery Excavating
(616) 902-5885
Kent County Drain Commissioner
(616) 632-7910
powered by Advanced iFrame

TOWNSHIP PARK UPDATE: Access to the park entrance on Dade will be limited on Tuesday and Wednesday this week as Montgomery installs the force main through this area.
This Week:
Next Week:
This Week:
Next Week:
This Week:
Next Week:
Progress Report:
Montgomery will be on site next week moving mailboxes, delivering equipment and materials to the site, and completing some preliminary utility locating. The week of September 15, Montgomery will begin force main construction at the Plainfield and Vineyard intersection and construct the new force main pipe back to the pump station. Black Gold will be on site this week as well to pulverize the existing roads which will be impacted by construction.
Montgomery Excavating is targeting the week of September 8 or 15 to begin construction on the force main. Montgomery tentatively plans to start construction of the force main at the pump station and work towards Plainfield Avenue. However, Montgomery may complete some work at the Vineyard and Plainfield intersection right away ahead of the MDOT paving project.
Over the next few weeks you will begin to see equipment, Miss Dig flags, and construction staking show up on site. We ask that residents do not tamper with flags or stakes as this will cause delays in construction. Montgomery will do their best to keep the construction area accessible for school traffic, but we ask residents to be courteous and cautious while driving through the active construction zone.