City of Roosevelt Park - Maple Grove and Broadway Resurfacing

Project Information

The City of Roosevelt Park will be resurfacing Maple Grove Road from Norton Avenue to Broadway Avenue, and Broadway Avenue from Roosevelt Road to Henry Street. This work will consist of removing the top layer of asphalt and placing a new asphalt surface course. Sidewalk ramps will be upgraded throughout the project and the paver crosswalks on Broadway Avenue will be replaced with concrete crosswalks.

Maple Grove Detour Map

Broadway Detour Map

Access/Traffic:

Maple Grove residents will have access to their driveways every night and throughout most of the project. There will be short periods of time during road milling and road paving when access will be interrupted. The Contractor will notify residents prior to these times to allow cars to be parked on side streets.

During work on Broadway Avenue traffic west bound traffic will be maintained throughout the project with lane shifts around the work site. East bound traffic will be detoured along Roosevelt Road and Summit Avenue.

Mail:

Mail service will be maintained throughout the project.

Garbage Pickup:

Garbage service will be maintained. We ask that you have your garbage bin at the curb the night before pick-up in order to allow for the contractor to relocate them if necessary.

Contact

P&N Engineer
Matt Hulst, Project Manager
231-799-9093

P&N Construction Observer
Tom Eilers
231-578-7986

Contractor
Michigan Paving and Materials
Seth VanderKooi
616-235-2284

City of Roosevelt Park
Ben VanHoeven, DPW Superintendent
231-755-3721

Crosswalks were installed and structure covers were completed. Only a little bit of work remaining. Thank you for patience with this project!

Work Completed since last update.

  • Manhole covers were completed in the west bound lane.
  • The second half of the crosswalks were completed. 

Anticipated Work for the Coming Week

  • Striping will be installed early week weather dependent.
  • Traffic control will be removed following striping.
  • Remaining clean-up and restoration will be completed.

The end is in sight. Paving operations are complete and only the crosswalks and striping remain!

Work Completed since last update.

  • The west bound lane surface was removed and repaved.

Anticipated Work for the Coming Week

  • Saw cutting and removal of the roadway for the west bound crosswalks are scheduled for Monday and Tuesday.
  • Concrete crosswalk installation will be completed mid-week.
  • West bound lane will remain closed until the concrete is cured.

Work has now shifted to the west bound lane of Broadway Avenue with removals and concrete curb and sidewalk work.

Work Completed since last update.

  • The east bound crosswalks were installed.
  • East bound lane was opened to traffic and west bound lane was closed.
  • Curb replacement was completed on the west bound lane
  • Sidewalk ramps were replaced on the west bound lane

Anticipated Work for the Coming Week

  • Milling of the west bound lane is tentatively scheduled for Monday or Tuesday of next week (August 11 or 12) with paving following a day or two after milling weather dependent.
  • Crosswalk installation may occur near the end of next week or the following week.

Work continued on the east bound lane of Broadway Avenue with paving and preparation for crosswalk installation.

 

Work Completed since last update

  • Parking lanes on both sides of Broadway were paved.
  • The east bound lane and half of the center turn lane were milled and paved.

Anticipated Work for the Coming Week

  • Monday and Tuesday the east bound lane and the side streets will be cut at the cross-walk locations and the surface removed.
  • Wednesday, concrete for the crosswalk is scheduled to be placed. Following placement of the concrete they will be left to cure until August 4 when the traffic will be shifted and work will begin on the west bound lane.

Please be aware of the construction work, do not assume that equipment operators can see you. Do not approach heavy equipment.

This was a good week on Broadway with completion of the concrete sidewalk and curb work on the south side of the road and preparation for paving of the parking lanes.

Work Completed since last update.

  • Concrete sidewalk ramps were placed along the south side of Broadway.
  • Milling of the parking lanes on both sides of Broadway were completed.

Anticipated Work for the Coming Week

  • The parking lanes on both sides of the roadway will be paved early in the week depending on weather.
  • Mid-week the south travel lane (eastbound) will be milled and paved.
  • Removals for the south side crosswalk installation may begin at the end of the week but more likely the following week.

Please be aware of the construction work, do not assume that equipment operators can see you. Do not approach heavy equipment.

Much progress was made this week with completion of paving on Maple Grove and removals started on Broadway. From now on the focus of the project will be on Broadway Avenue.

 

Work Completed since last update.

  • Paving on Maple Grove was completed.
  • Concrete removals on the south side of Broadway were completed.
  • Curb and Gutter repairs and replacement were completed on the southside of Broadway.

Anticipated Work for the Coming Week

  • Concrete sidewalk will be placed on the south side of Broadway near midweek.
  • Following sidewalk replacement, traffic will be shifted and removals will begin on the north side of Broadway.

Please be aware of the construction work, do not assume that equipment operators can see you. Do not approach heavy equipment.

Even with this being a shorter week, much progress was made. Concrete on Maple Grove is completed, milling on Maple Grove was completed and paving started.

Work Completed since last update.

  • Maple Grove concrete was completed.
  • Milling of the Maple Grove was completed.
  • New pavement was applied from Norton to Summit.

Anticipated Work for the Coming Week

  • Paving of Maple Grove from Summit to Broadway will be completed on Monday.
  • Road closure on Broadway will begin with west bound traffic being maintained and east bound traffic following the posted detour. West bound traffic will shift as needed to either the north side or south side of the roadway.
  • Broadway Avenue concrete removals will begin.

Milling work will be completed this Monday June 30. Currently Michigan Paving and Materials is scheduled to pave Maple Grove from Norton to Summit on Thursday July 3. The remainder will be paved the week of July 7.

Work on Maple Grove has begun. This week, removals of concrete sidewalk ramps and curb started as well as placement of concrete curb and gutter on Maple Grove.

 

Work Completed since last update.

  • Removals of concrete curb and sidewalk ramps began and are nearly complete.
  • Concrete curb was installed near the south end of the Maple Grove portion.

Anticipated Work for the Coming Week

  • Removals will continue.
  • Concrete curb and sidewalk ramp installation will continue.
New Curb at Durham

 

Please be aware of the construction work, do not assume that equipment operators can see you. Do not approach heavy equipment.

Work on Maple Grove will be starting on Tuesday June 17. Focus will be on removing sidewalk ramps and damaged curb, and preparing for concrete. Depending on weather, concrete installation for new sidewalk ramps and curb will begin Saturday, June 21.