City of Roosevelt Park - Maple Grove and Broadway Resurfacing

Project Information

The City of Roosevelt Park will be resurfacing Maple Grove Road from Norton Avenue to Broadway Avenue, and Broadway Avenue from Roosevelt Road to Henry Street. This work will consist of removing the top layer of asphalt and placing a new asphalt surface course. Sidewalk ramps will be upgraded throughout the project and the paver crosswalks on Broadway Avenue will be replaced with concrete crosswalks.

Maple Grove Detour Map

Broadway Detour Map

Access/Traffic:

Maple Grove residents will have access to their driveways every night and throughout most of the project. There will be short periods of time during road milling and road paving when access will be interrupted. The Contractor will notify residents prior to these times to allow cars to be parked on side streets.

During work on Broadway Avenue traffic west bound traffic will be maintained throughout the project with lane shifts around the work site. East bound traffic will be detoured along Roosevelt Road and Summit Avenue.

Mail:

Mail service will be maintained throughout the project.

Garbage Pickup:

Garbage service will be maintained. We ask that you have your garbage bin at the curb the night before pick-up in order to allow for the contractor to relocate them if necessary.

Contact

P&N Engineer
Matt Hulst, Project Manager
231-799-9093

P&N Construction Observer
Tom Eilers
231-578-7986

Contractor
Michigan Paving and Materials
Seth VanderKooi
616-235-2284

City of Roosevelt Park
Ben VanHoeven, DPW Superintendent
231-755-3721

Work on Maple Grove will be starting on Tuesday June 17. Focus will be on removing sidewalk ramps and damaged curb, and preparing for concrete. Depending on weather, concrete installation for new sidewalk ramps and curb will begin Saturday, June 21.