This Week:
- Dean’s completed transmission main installation in Buth Drive and crossed Buth Drive at Pine Island Drive.
- Dean’s pressure tested and disinfected the new transmission main in Buth Drive.
- Dean’s began transmission main installation in Pine Island Drive at Buth Drive and worked south.
- Buth Drive was closed to thru traffic. Pine Island Drive traffic was shifted west to accommodate the transmission main construction on the east side of the road.
Next Week:
- Dean’s will continue transmission main installation along Pine Island Drive.
- Side streets east of Pine Island Drive will be closed only as needed to install the transmission main across them. Local traffic will be maintained at all times.