Upcoming Work: The second Pipestone Road closure is scheduled to begin April 22. Pipestone Road will be closed to through traffic from Napier Ave to Mall Drive, with a detour following Napier Ave, Plaza Drive, and Mall Drive, as illustrated on the map above. Pipestone Road will be fully closed at the work area located near the Meijer Gas Station. Residences and businesses north and south of the work area, including the Meijer Gas Station, will remain accessible. This traffic closure is scheduled from April 22 through May 17 for the installation of gravity sewer within the Pipestone Road work area.
© 2024 Prein&Newhof, All Rights Reserved