This Week:
- Force main construction continues along Wolven Avenue with the force main being installed between 11 Mile Road and Hopewell Drive.
- Dean’s worked on restoration and project cleanup in the Saddle Ridge neighborhood and along Edgerton Avenue so that this work could be completed before school starts.
- Concrete curb and gutter was replaced at the Saddle Ridge entrance.
- Paving of the road patches in the Saddle Ridge neighborhood is scheduled for today (8/23).
Next Week:
- De Witt Trenching will continue to install force main pipe along Wolven Avenue between Hopewell Drive and Bent Tree Ridge.
- Dean’s pipe crew will leave the site for about a week to allow De Witt to get more pipe installed along Wolven Avenue. Dean’s will then come back and start to connect the directionally drilled sections of pipe and install air release structures.