Here is a brief update for the improvements to Glenside Boulevard between Broadway Avenue (Garrison) and Sherman Boulevard. Crews were very busy this week and a lot was accomplished.
Work Completed this Past Week:
- A new casing was drilled under the Railroad tracks for the storm drainage pipe to be installed inside
- Storm drainage pipe and structures were installed inside the casing pipe and from the railroad tracks to the north end of the job
- Driveway and sidewalk removals were completed on the southern half of the project
Work Anticipated Week of August 7, 2023
- Completion of the storm drainage pipe and structures and connection to the existing system
- Preparations for new road base gravel material to be installed
- Surveying for new concrete curb and gutter
- New hydrant to be installed
Work Anticipated Week of August 14, 2023
- Completion of any remaining underground work
- Grading of the roadway base gravel material
- Preparation for new concrete curb and gutter
Construction will still remain on schedule for being completed in September 2023.