Here is a brief update for the improvements to Glenside Boulevard between Broadway Avenue (Garrison) and Sherman Boulevard.  Crews were very busy this week and a lot was accomplished.

 

Work Completed this Past Week:

  • A new casing was drilled under the Railroad tracks for the storm drainage pipe to be installed inside
  • Storm drainage pipe and structures were installed inside the casing pipe and from the railroad tracks to the north end of the job
  • Driveway and sidewalk removals were completed on the southern half of the project

 

Work Anticipated Week of August 7, 2023

  • Completion of the storm drainage pipe and structures and connection to the existing system
  • Preparations for new road base gravel material to be installed
  • Surveying for new concrete curb and gutter
  • New hydrant to be installed

 

Work Anticipated Week of August 14, 2023

  • Completion of any remaining underground work
  • Grading of the roadway base gravel material
  • Preparation for new concrete curb and gutter

 

Construction will still remain on schedule for being completed in September 2023.