Progress Report:
This week Dean’s and De Witt have made good progress installing the force main in the Saddle Ridge development. Dean’s brought in a second crew to install the force main from the cul-de-sac on North Saddle Ridge Court down to the lift station site. Dean’s other crew has installed most of the force main along Saddle Ridge Drive. De Witt has installed all of the force main along North Saddle Ridge Court and is working on the section between Saddle Ridge Court and the roundabout. Dewatering was set up at the lift station site and the 10 foot diameter wet well structure was delivered.
Upcoming Work:
Next week De Witt will complete the force main installation along Saddle Ridge Drive, under the roundabout. De Witt plans to start working on the US-131 crossing end of next week. Dean’s crew will complete the force main installation along Saddle Ridge Drive and will start installing the force main along Edgerton Avenue. Dean’s second crew will complete the force main construction down to the lift station site and begin excavating to set the 10 foot diameter wet well structure over 20 feet deep behind the existing wastewater treatment plant.
Extra Notes:
If your driveway has not been marked for removal with pink paint it will not be removed.
Dean’s will have to open cut the South Saddle Ridge Court and Saddle Ridge Drive intersection to install the force main under the road at the proper grade. While this work is being completed, South Saddle Ridge Court will have very limited access during the day. Dean’s will coordinate with residents on South Saddle Ridge Court prior to this closure so residents can plan accordingly.