Progress Report:

  1. East half of the pavement on Sanford was removed between Oakwood and Summit
  2. New water main installed in the intersection of Oakwood and Sanford
  3. Water main installed in Sanford from Oakwood to north of Amsterdam
  4. Pavement was removed on Columbia between 5th Street and Sanford
  5. New water main installed in Columbia from 5th Street to Sanford
  6. Marked Trees are being Removed in the street Right-of-Way
  7. City Crews were confirming water main valves

Upcoming Work:

  1. Pavement will be removed on Columbia between Sanford and Peck Streets
  2. Continue water main installation on Columbia between Sanford and Peck Streets
  3. Continue water main installation on Sanford from south of Rotterdam north to Summit
  4. Replace sanitary sewer manhole at Sanford and Amsterdam
  5. City Crews will continue to work on existing water main valves – this may disrupt the water flow periodically in the drinking water system. Customers may experience air in their water lines and discolored water. Be sure to flush all lines, but especially the cold water through a bath tub or faucet without a screen and run until the water is clear.

Please remember that the streets are closed to thru traffic, but they will remain open to local residents.  For the safety of workers, please avoid driving through the construction sites.  No on-street parking is allowed within the construction zone.