Progress Report:
This week, Brenner Excavating was primarily focused on stripping topsoil and grading along Robinson Road, starting from the Robinson Road and Cascade Road intersection and moving westward toward Lakeside Drive. In addition, sand was brought in to prepare the subbase for concrete.
Consumers Energy has been on site throughout the week relocating the remaining guy wires and utility poles.
T&D Concrete poured ADA ramps, sidewalks, and several driveways, beginning at the driveway to Manhattan Park and extending to the east side of Manhattan Road. T&D is scheduled to return on Monday to continue pouring ADA ramps and sidewalks, progressing eastward to El Centro Boulevard.
The temporary lane shift on Cascade Road is expected to be removed up to Rexford Drive by this evening.
Upcoming Work:
Brenner Excavating will continue grading the sand subbase and begin bringing in topsoil. We anticipate that all driveways along Cascade Road will be accessible by the end of next week, weather permitting.
Thank you for your continued patience and cooperation as work progresses.