Macatawa River HDD:

This week Gabe’s completed the second ream pass for the drill (36-inch diameter). A specialized rock reamer was used due to the soils that were encountered. Start of the final ream pass (44-inch diameter) will begin shortly, followed by the pipe pull which is expected to occur early November.