This week, the Contractor fought a lot of rainy weather but was able to cut the road grade down and place gravel road base from Continental to Bailey on the south side of the road. The curb and gutter that was proposed this week was delayed due to weather. The contractor completed the drainage system on the south side of the road as well. The remaining asphalt on the north side of the road has been removed as has the north curb and gutter and most of the sidewalk.

Here is what to expect next week, the week of September 16, 2019