Work Completed This Week

  • All 8-inch sanitary sewer main has been installed on Westwood Street and Lexington Avenue
  • The 8-inch water main has been installed on Westwood Street and Glen Avenue.
  • No work was performed on Thursday and Friday this week while the contractor waited on bacteria testing results.
 

Anticipated Work Next Week

  • Once the new water main passes the required water quality testing, the contractor anticipates tying in the water main to the City’s water system on Monday, August 3.
  • Water services and sanitary laterals will begin to be installed on the west side of Westwood Street throughout the week.
 

Current Road Closures

  • Westwood St. is closed to through traffic from Wickham Dr. to Randolph Ave.
  • Lexington Ave. is closed to through traffic at Westwood St.
  • Randolph Ave. is closed to through traffic at Westwood St.