Last Week
Riverworks Construction continued building the 310 foot boardwalk on 9 Mile Road. This boardwalk will consist of four 60 foot and two 72 foot spans that will create a curved boardwalk to follow the natural curve around the pond. So far, they are nearly halfway done with the main framing.
This Week
Riverworks Construction will drive the remaining piles and continue construction of the boardwalk. Once the bulk of the framing is done, they will add the decking and railing along the entire length.