Work Completed This Week

  • All of the existing asphalt, curb and gutter, and driveways have been removed within the project limits.
  • A 38” oak tree was removed within the easement near McGraft Park to allow for the sanitary sewer to be installed.
  • An internal sanitary sewer drop was installed at the manhole near Ruddiman Creek and the 8-inch sanitary sewer has begun to be installed to the east.
  • The water main was temporarily shut down on Thursday in order to abandon a portion of the water main within the easement.

 

Anticipated Work Next Week

  • Continue placing 8” sanitary sewer and manholes in the easement and in Westwood St.

 

Current Road Closures

  • Westwood St. is closed to through traffic from Wickham Dr. to Randolph Ave.
  • Lexington Ave. is closed to through traffic at Westwood St.
  • Randolph Ave. is closed to through traffic at Westwood St.