Progress Report: Approximately 750 feet of force main has been installed in Riverview Drive from the south end of the project up to Gray Street. Access to the boat launch is being maintained and the Stage 1 detour is remaining in place.

Upcoming Work: Pressure testing of the installed force main will occur prior to tying into the existing force main. A bypass system will also be set up to maintain Township system wastewater while the connection to the existing force main is made.