The backwash manhole was installed yesterday, which will connect to the 4-inch backwash pipe.

Upcoming Schedule:

  • Construction of the outlet will continue, weather permitting.
  • The crew anticipates directionally drilling the 4-inch backwash pipe and 1-inch conduits this week.