Work completed recently:
  • Water main installation continues south of Lewis Street
  • Grading and preparation of sidewalk concrete between Slocum and Sophia
What to expect week of May 27, 2024:
  • No work on Monday, May 27, 2024 due to Memorial Day Holiday
  • Pour concrete curb and gutter and sidewalk between Slocum and Alice – Please allow a minimum of 3 days for the concrete to cure before driving on it
  • Continue water main installation from south of Lewis to Benston
What to expect week of June 3, 2024:
  • Continue water main installation on the east side of Warner Street south of Lewis Street to Benston Street
  • Restoration of areas between Slocum and Sophia
Crews installing water main pipe in the trench.