The Eagle Lake Crooked Lake project start-up was completed on November 20, 2024. There are a few punch list items to complete; however, the system is working as designed and is available to be operational if needed. As of this posting the levels at both Eagle Lake and Crooked Lake are below the level where the system would be turned on.