Ice & water shield was installed on the filter building roof last week. Work has paused due to this week’s low temperatures.

Upcoming Schedule:

  • Construction of the outlet will continue, weather permitting.
  • The crew has begun to fuse the 4 inch backwash pipe which will be directionally drilled.