No work took place at the Adrian Pedestrian Tunnel construction site this past week due to the weather, but work is planned to resume next Monday, February 2, 2026. The work still remains on schedule.
Progress Report
- Dewatering continues during the construction downtime to ensure dry excavation
Upcoming Work Planned for Next Week:
- Old utility poles will be removed
- Additional topsoil stripping and stockpiling
- Excavation on the west side will begin for drain installation
- No lanes of traffic on M-52 are anticipated to be affected until late February