Road rebuilding and water service installation continues on Catherine Avenue.  Water main connections, water services and road rebuilding will continue this week.

Work Completed Last Week:

  • Concrete curb was completed on Catherine between Irwin and Terrace.
  • Top course of asphalt finished on Irwin.
  • Restoration of grass began on Irwin and Catherine from Irwin to Ransom.

Anticipated Work This Week:

  • Road rebuilding continues on Catherine between Terrace and Wood.
  • Continue installing water services between Terrace and Wood.
  • Connect water main to the existing system at Pine and Ambrosia.