Progress Report
- Broadway: All water mains are now installed, and all water customers are connected to the new water mains.
- Broadway: Crews continue to install underdrain and road gravel base between 5th and 9th Streets
- Delano Avenue: New water main and storm drains were installed in the intersection of Superior. New valves were added to the 14-inch transmission main.
- Sanford Street: New water main pipe has been installed from Norton to Oakwood and in Maplewood between Sanford and Jefferson.
The posted detour for Broadway Avenue is Glade Street to Summit Avenue to Peck Street back to Broadway.
The posted detour for Delano Avenue is Reynolds Street to Hackley Avenue to Getty Street
The posted detour for Sanford Street is Oakwood Avenue to 5th Street to Norton Avenue
Upcoming Work Planned for Next Few Weeks:
- Broadway: Roadway restoration work will continue between 9th and 5th Streets with underdrain installation and gravel road base installation
- Broadway: Storm drains will be installed in several intersections
- Broadway: Sanitary sewer main will be replaced between Waalkes and Temple
- Water service replacements are happening all over the City as part of the Lead Service Line Replacement program
- Delano: Water main connections will take place in the intersections of Howden and Wood next week. Expect some water disruptions in this area.
- Delano: Storm drains will be replaced in several intersections
- Sanford: New water mains will be tested and connected later in the week.
- Norton: New valve will be added to the 18-inch water transmission main at Peck Street
- Getty Tank: Repainting will begin with a very large containment shroud being installed for protection while the old paint is blasted off before the tank can be repainted