Work continued on State Street placing concrete footings, planter boxes, and seat walls.  This week light poles will be refinished and grading will begin in preparation of sidewalk west of State Street.

 Work Completed Last Week:

  • Placed planter boxes west of State.
  • Placed clock tower foundation.
  • Placed Christmas tree footings.
  • Irrigation lines run through previously placed conduit.

Anticipated Work This Week:

  • Continue placing concrete planter boxes.
  • Continue placing concrete footings for the fireplace.
  • Sandblasting and painting existing light poles.
  • Site grading in preparation for sidewalk west of State.