Progress Report:

21-inch PVC sanitary sewer is currently being installed along the south side of Belding Road, west of Egypt Valley Avenue. Dean’s Excavating has been battling a tough groundwater condition which has made the sanitary sewer replacement progress slower than anticipated. As construction progresses east the sanitary sewer is expected to be above the groundwater elevation which will help with increase productivity.