Progress Report:

The aeration detention tank now has a concrete roof, and contractors have been working to remove the extensive shoring from inside. They are also preparing the walls of the Water Treatment Plant to install trusses, as the floor slabs inside the WTP are now completed.

Upcoming Work:

The 26-foot-long pressure filter vessels are scheduled to arrive the week of August 3, and will be guided into place by crane.