Progress Report:

K&R continues to make progress on 120th Ave with several crews focusing on gravity sewer, water main, and road rebuilding. The water main crew completed replacing and connecting to the existing water main in the James St and 120th Ave Intersection. The gravity sewer crew has resumed progress on installing 21-inch gravity sewer on 120th Ave after installing an additional method of dewatering. A road crew arrived late this week and began building road on 120th Ave starting at Lakewood Blvd heading north.