Work Completed
- Piping from Control Structures A and B to Pond 1 installed
- Piping from Control Structure A to Pond 2 mostly installed
- New force main tied in to existing force main and Control Structure A
- Old pipes in Pond 1 abandoned with flowable fill
- Began pumping remaining water out of Pond 2
Upcoming Work
- Excavate for Screening Building foundation and install piping under and around building
- Coordinate with Biotech Agronomics to remove biosolids from Pond 2
- Install remaining piping into Pond 2
- Begin work on Screening Building foundation