Progress Report:

Riverworks Construction wrapped up construction of the large boardwalk at the corner of Pettis Road, with only mesh fencing remaining to be installed. The crew then turned to the boardwalk connected to the large boardwalk, where support beams, joists, and rail posts have been installed. A second Riverworks crew drove piles last week for the boardwalk that will cross Bear Creek. Integrity Landscaping has been installing block for the east retaining wall along Cannonsburg Road.

Upcoming Work:

This week Riverworks will continue construction of the connected boardwalk and pile driving for the Bear Creek boardwalk. Integrity expects to complete all retaining wall construction by mid-week. Terracon will return to regrade the path in preparation for paving, which may take place later this week.