August 5, 2026
Construction is expected to start next Monday, August 10 on the streets shown on the map. The red streets will be done as Phase 1 and then the blue streets will follow. In addition, the driveways to 2282 & 2283 Partridge Ct (shared driveway), 4899 North Quail Crest, 4915 North Quail Crest, 2270 South Thrush Ct, and 5073 South Quail Crest will be done as part of Phase 2. Also, 4 speed humps will be placed at the end of Phase 2.
Phase 1 (units affected: 4811 – 4834 NQC, all Teal Ct, 4916 – 5069 SQC, all Grouse Ct, 5135 Burton)
| Date/Day | Road/Traffic | Activity | Contractor |
| August 10 M | No impact | Set up Traffic Control/Staking/SESC | Rieth-Riley |
| August 10 M | Burton entrance closed | Remove and Replace Curb and Gutter | Youngstrom |
| August 10-11 M-Tu | Single lane closure | Lower Manholes | Youngstrom |
| August 12 W | Single lane closure | Mill Red Section | JL Milling |
| August 12-13 W-Th | Single lane closure | Proof Roll/Undercuts/Grading | Youngstrom |
| August 14 F | Single lane closure, expect delays | HMA Base Course | Rieth-Riley |
| August 15-17 Sa-M | Single lane closure | Raise Manholes | Youngstrom |
| August 18 Tu | Road closed, limit use as much as possible | HMA Top Course | Rieth-Riley |
Phase 2 (units affected: 5073 – 5145 SQC, all Bobwhite Ct, all Partridge Ct, all Pheasant Ct)
[driveways: 2282 & 2283 Partridge Ct (shared), 4899 NQC, 4915 NQC , 2270 S Thrush Ct, 5073 SQC]
| Date/Day | Road/Traffic | Activity | Contractor |
| August 19 W | No impact | Set up Traffic Control/Staking/SESC | Rieth-Riley |
| August 19 W | Spaulding Ave entrance closed | Remove and Replace Curb and Gutter | Youngstrom |
| August 19 W | Single lane closure | Lower Manholes | Youngstrom |
| August 19-24 W-M | Driveway closure | Remove & Grade HMA Driveways | Youngstrom |
| August 24 M | Single lane closure | Mill Blue Section | JL Milling |
| August 24 M | Single lane closure | Prep Phase 2 & cut Butt Joints/Speed Bumps | Rieth-Riley |
| August 25 Tu | Single lane closure | HMA Base Course/Driveways/Speed Bumps | Rieth-Riley |
| August 26 W | Single lane closure | Raise Manholes | Youngstrom |
| August 27 Th | Road closed, limit use as much as possible | HMA Top Course/Driveways | Rieth-Riley |
| Aug 28-Sep 5 F/Sa | Minimal impact | Turf Restoration | Youngstrom |
| September 8 Tu | Minimal impact | Pavement Markings/Signs | ICS |
| September 9 W | Minimal impact | Remove Traffic Control | Rieth-Riley |
- The Burton St. entrance will be closed from August 10 to August 17.
- The irrigation system will be shut off by the Association prior to paving the top course of asphalt.
- The driveways that are being replaced will be removed on or about August 19.
- Please avoid parking on the new asphalt for approximately 2 days and especially on the edges to avoid damaging your new road.
- Parking at the clubhouse will not be permitted on days that milling or paving is scheduled. Currently, those days are August 12, 14 and 18.
- Please be patient while the project is going on and do you best to avoid unnecessarily driving through the active construction area.