Progress Report:

K&R continues to install 24-inch gravity sewer along E Lakewood Blvd towards 120th Ave. Bypass pumping operations for the existing flow were utilized to temporarily connect a new manhole to an existing manhole. Once the laterals downstream of this temporary connection have been transferred to the new sanitary sewer, this section of existing sanitary sewer will be ready for abandonment. Earlier this week, all gravity sewer downstream of the temporary connection back to PS No. 2 was air tested and passed.