Progress Report
- Broadway: All water mains are now installed. Water services are nearly complete. Only a few remain to be replaced to the new water main.
- Broadway: Crews continue to install underdrain and road gravel base between 5th and 9th Streets
- Delano Avenue: New water main and storm drains were installed in the intersection of Dyson. A water main reconnection was made at Keating near McIlwraith that was discovered to be disconnected since 1975.
- Sanford Street: New water main pipe has been installed from Norton to Maplewood.
The posted detour for Broadway Avenue is Glade Street to Summit Avenue to Peck Street back to Broadway.
The posted detour for Delano Avenue is Reynolds Street to Hackley Avenue to Getty Street
The posted detour for Sanford Street is Oakwood Avenue to 5th Street to Norton Avenue
Upcoming Work Planned for Next Few Weeks:
- Broadway: Roadway restoration work will continue between 9th and 5th Streets with underdrain installation and gravel road base installation
- Broadway: The last remaining water services will be connected to the new water main
- Broadway: Storm drains will be installed in several intersections
- Broadway: Sanitary sewer main will be replaced between Waalkes and Temple
- Water service replacements are happening all over the City as part of the Lead Service Line Replacement program
- Delano: Additional water main connections will take place east of McIlwraith Street
- Delano: Storm drains will be replaced in several intersections
- Sanford: New water main will continue to be installed between Maplewood and Oakwood
- Getty Tank: Repainting will begin with a very large containment shroud being installed for protection while the old paint is blasted off before the tank can be repainted



