Van Buren – Butternut to US-31
- Van Buren from Butternut to US-31 is open to traffic.
- The restoration crew has been preparing the area for winter and addressing some punchlist items.
164th Ave – New Holland to Van Buren
- 164th Ave is closed between New Holland and Van Buren.
- 164th Avenue has been paved. Pavement striping is scheduled for next week.
- Restoration continues on 164th Avenue.
Van Buren – US-31 to 96th Ave
- Van Buren from US-31 to 96th Ave is closed.
- The intersection of Van Buren and 112th Ave was paved and reopened.
- The intersection of Van Buren and 104th Ave has been closed.
- One pipeline crew is building transmission main between 116th Ave and 112th Avenue.
- A second pipeline crew built transmission main through 104th Avenue. The crew will continue eastward next week.
- Road building continues west of the transmission main installation.
Easement
- Site cleanup and punch list work will continue next week.
Drinking Water Plant – Surge Suppression System
- Remaining building footings and foundation walls were poured
- Lower level concrete pipe and valve supports will be poured
- Foundation walls will be dampproofed, insulated, and backfilled