Work Completed:
- Remaining piping between Bypass Control Structure and Control Structure B installed
- Piping from Pond 4 to Control Structure B installed
- Control Structure B gate valves installed
- Control Structure A installed
- Pond 4 liner repaired
- Concrete pads poured over clay liner in Ponds 3 and 4
- Progress Map
- Install piping from Pond 1 to Control Structures A and B
- Partially install piping from Control Structure A to Pond 2
- Connect existing influent force main to Control Structure A
- Begin transfer of water from Pond 2 to Ponds 3 and 4, discharge from Pond