The jack & bore of the 42″ steel casing under the box culvert near US-31 is now complete. K&R has begun excavation of the existing gravity sewer pipe in front of the pump station. Bypass pumping operations of the existing sewer flow are underway as well. Consumers Energy plans to be onsite this later this week to move the power poles along the south side of Lakewood Blvd.