Work on Catherine continues this week with sanitary lateral installation and water main installation between Irwin and Terrace.
Work Completed Last Week
- New water main was tied-in to the existing system in Butler Street following all testing.
- Turf restoration began at Butler Street.
- Sanitary Sewer main was installed on Catherine between Irwin and Terrace.
- Sanitary lateral installation began on Catherine
Anticipated Work – Butler
- Continue turf restoration will begin toward the end of the week.
Anticipated Work – Catherine
- Sanitary Sewer installation between Terrace and Irwin.
- Continue sanitary lateral installation between Irwin and Terrace.
- Begin installation of water main on Catherine, with an expected start date of Monday 3/16.