Utility work on Catherine continues with sanitary sewer main and water main east of Terrace St. Water main installation will continue this week between Pine St. and Ambrosia St.
Please note: Irwin Ave. will be closed to traffic between Peck St. and Clinton Street starting on Monday May 11th for water main installation.
Work Completed Last Week
- Water main connected to the existing system at Ransom St.
- Completed sanitary sewer main.
- Continued installation of sanitary laterals
- Water main installed on Catherine Ave. between Pine St. and Terrace St.
Anticipated Work This Week
- Continue installation of water main between Pine St. and Ambrosia St.
- Sample and test water main on Catherine between Terrace and Ambrosia St.