Restoring Ludington’s Marina: A Dockside Transformation

City of Ludington

The Story

Ludington has long been a haven for boaters, anglers, and lake lovers. Nestled on the north side of the channel between Lake Michigan and Pere Marquette Lake, the Ludington Municipal Marina has welcomed visitors since 1979. It’s a prime spot for salmon and trout fishing—so much so that, according to DNR reports, Ludington sees more fish caught per angler hour than anywhere else in Michigan.

After decades of service, the marina’s infrastructure was showing its age. By 2019, the utilities were outdated, struggling to keep up with modern boats. Electrical issues raised safety concerns, the floating docks were failing, and the marina lacked accessible boat slips. The four original floating docks constructed in 1981 were in particular need of replacement due to failing floats, lack of accessibility, and to improve functionality.

A preliminary engineering study guided the scope of the project and helped secure crucial grant funding through the DNR Waterways program. Permits were obtained, and a phased approach was developed to ensure smooth transitions between upgrades.

Timing was critical as construction had to take place outside the busy boating season to minimize disruption. However, nature had its own plans as record-high water levels caused flooding during the first phase. Later stages faced unexpected material delays, but the team pressed forward despite these challenges. Dock C was completed  in 2021, ensuring accessibility and laying the groundwork for improved electrical and fire protection systems. The rest of the docks were completed by 2025. Each phase was carefully coordinated to keep the marina operational while progressing toward completion.

The transformation was made possible through a combination of marina funds and MDNR grants. While the project used floating dock designs not typically funded by the DNR, they proved to be the best solution for Ludington’s unique waterfront and were approved for use. Today, the Ludington Municipal Marina stands renewed and ready to welcome boaters for years to come.

Our Role

  • Engineering Study
  • Permit Assistance
  • Survey
  • Design Engineering
  • Construction Observation

Contact

Matt Hulst, PE
Project Manager
231-798-0101

Funding

$1.3M MDNR Waterways Fund

Marina funds

Similar Projects